AYDIN DAM CONSTRUCTION
AYDIN DAM CONSTRUCTION
Our team worked at the Aydın Yaylakavak project. The body volume of the dam, which is an earth body fill type, is 4,895,000 m³, its height from the stream bed is 71.00 m., the lake volume at normal water level is 31.14 hm³, and the lake area at normal water level is 0.99 km².
Project Details
Project Budget:
$110.000.000