BODRUM INFRASTRUCTURE WORKS
BODRUM INFRASTRUCTURE WORKS
Repurposing and repair initiative for the existing sewage and canalization infrastructure. Employing advanced Geographic Information System (GIS) mapping and remote sensing technologies, we identified deteriorating sections and prioritized intervention areas. Utilizing trenchless rehabilitation techniques such as cured-in-place pipe (CIPP) lining, we enhanced structural integrity, minimizing disruption and reducing maintenance costs. The project integrates state-of-the-art SCADA (Supervisory Control and Data Acquisition) systems across the entire network, enabling centralized monitoring and control for optimized operational efficiency and a projected 30% increase in the overall lifespan of the Bodrum sewage and canalization infrastructure.
Project Details
Project Budget:
$30.000.000